After finding Geo Green Power through the National Farmers Union magazine, Mr Wilkinson contacted us for a quote. Following this, we were contracted to carry out the 450kWp solar PV installation for Sutton Farm.
Our team were delighted to help Sutton Farm on their journey to generating their own energy. A pre-installation survey was conducted so that a full design and access plan could be created, the DNO connection agreement was secured, and work began. Our dedicated site team completed the project with care: from roof strengthening, through to panelling and completion of the electrical installation.