Commercial Solar Installers: Swadlincote
The Trusted Commercial Solar Company Serving Swadlincote
From its legendary industrial heritage as a world leader in pottery, brick-making, and pipe manufacturing to its modern transformation into a key logistics and engineering hub within the National Forest, Swadlincote is a town defined by hard work and environmental renewal.
At Geo Green Power, we provide the high-performance commercial solar Swadlincote businesses need to slash overheads, secure energy independence, and achieve ambitious net-zero targets in the heart of South Derbyshire.
Why Businesses Choose Geo Green Power
We are more than just commercial solar panel installers for Swadlincote. We are your strategic energy partners. We have a proven track record of delivering multi-megawatt systems for the UK’s most energy-intensive industries, helping South Derbyshire firms transition to renewable energy with total confidence.
- Premium “Tier 1” Technology: We only install the highest-efficiency panels and inverters from global leaders, ensuring that your commercial solar panel installation in Swadlincote provides maximum ROI and long-term durability.
- Turnkey Solutions: We manage every phase of the project, from structural roof surveys and DNO (grid connection) applications to bespoke system design and final commissioning.
- Zero Sub-Contractors: Our in-house, MCS-certified team manages every aspect of your project. Unlike many other providers, we ensure total quality control with no third-party hand-offs.
- Proven ROI: With energy market volatility, commercial solar in South Derbyshire typically offers a payback period of just 3 to 7 years, backed by a 25-year performance warranty.
Areas We Cover: Swadlincote & South Derbyshire
Our team delivers specialised commercial solar power solutions across Swadlincote and the surrounding district. Whether you operate a precision manufacturing plant in Woodville or a modern distribution facility near the A42 corridor, we have the local expertise to help.
Key Industrial & Commercial Areas:
- Industrial & Manufacturing Hubs: Tetron Point, Cadley Park, Boardman Industrial Estate, and the Woodville industrial corridor.
- Business Parks: Optimum Business Park, Sharpes Hill, and nearby Bretby Business Park.
- Regional Borders: Ashby-de-la-Zouch, Burton-upon-Trent, Measham, and Melbourne.
- Swadlincote Postcodes Served: DE11, DE12.
Complete Renewable Energy for Business
As leading commercial solar PV installers for Swadlincote, we provide a holistic approach to energy that goes beyond the roof.
We Plant A Tree For Every Quote We Produce
Did you know you can support reforestation efforts with Geo Green Power? We’ll plant one tree for every quote we produce! Simply request a free quote and we’ll take care of the rest.
Case Study: Engineering & Environmental Excellence (Derbyshire)
Reflecting the high-performance standards required in Swadlincote’s evolving industrial sector, Geo Green Power installed a high-capacity system for a major engineering firm. To address their significant energy demands for heavy machinery and climate-controlled assembly, we delivered a bespoke solution that proves why we are the commercial solar panel installers Swadlincote trusts for complex industrial projects. This installation provided immediate cost reductions and a substantial step toward their ESG goals.
Grants and Financial Incentives
Swadlincote businesses can access financial support to accelerate their transition to green energy. Through South Derbyshire District Council sustainability initiatives and regional funds, such as those supported by the D2N2 Local Enterprise Partnership, eligible SMEs can frequently find match-funded grants for energy-efficiency upgrades.
Furthermore, the UK government’s Annual Investment Allowance (AIA) and Full Expensing schemes allow companies to deduct 100% of the cost of their installation from taxable profits in the first year. These incentives make choosing Geo Green Power a high-yield financial decision for local enterprises.
Is Your Roof Working for You?
Don’t let valuable roof space go to waste. Transform your business overheads into a competitive advantage with the premier commercial solar panel installers Swadlincote trusts.
Call our regional office on 0800 988 3188 to discuss your project.
How long until I will see a return on my investment?
How long until I will see a payback on my solar investment?
Meet the Team
Chloe Reganaz
Kitty Cunningham
Rob Jennison
Craig Booth
James Cunningham
Installation Process
Your Enquiry
Customers can send an initial enquiry using our online form, via our online Live Chat, over the phone or they can simply send an email. Either way, we’re delighted that you have thought of us!
After receiving an initial enquiry, our surveyors will either call or send a customer information form to gain some more information on your project and the property. They will also view the site via satellite.
It’s essential for our team to understand your current electricity costs, energy usage and the space available for solar panels to determine the size of the system required and whether it will meet your objectives.
Pre-installation Assessment
If the project is progressing we’ll arrange a survey to visit the site and discuss the installation further. We’ll look at the roof and external space and assess the best location for the layout of panels, the inverters and the cable run.
A site visit enables us to understand the project in more detail and assess the costs involved. This is also a perfect opportunity for a thorough discussion about products and warranties and a chance for you to ask lots of questions.
Once the on-site survey is completed, our surveyor will discuss the project with the rest of the team, feedback on any queries raised during the site visit and provide a personalised quote for you to consider.
Once we receive the go-ahead your project is handed over to our operations team and we begin making your renewable energy plans a reality.
Installation Process Explained
For normal domestic properties, there is no requirement to gain planning permission, as long as the property is not a listed building or in a conservative area; and the installation sticks to the guidelines. Standalone panels can also be installed without seeking planning permission, although the size of the array is limited to 9m2, and 4m tall. The array must also be at least 5m from the property.
In general, the requirements for commercial installations are the same as domestic installations, however, we can provide specific advice about your individual situation as necessary. Our team will manage all of the planning requirements on your behalf. This will include local planning applications and liaising with your DNO to enable you to connect your system to the electricity network.
Pre-installation survey
Two lead members of our technical team will visit your site to specify scaffolding and access equipment, agree on the installation process and ensure that when we come to install we have everything we need. Any issues highlighted during the initial survey will be carefully considered and a plan or resolution agreed upon with you. This could be an alternative cable route or a slight modification to the design.
When booking the pre-installation survey you’ll be given an indicative installation date and following our visit we will be able to confirm this with you.
Installation
A week or so before your installation our scheduling team will contact you to confirm that everything is still on track and confirm start dates, any deliveries, and if required the erection of scaffolding.
Throughout the installation, our scheduling team will be on hand, and a site contact will also keep you posted on how we are progressing. We aim for the process to be as smooth as possible from start to finish using our considerable experience of installing Solar PV for over 10 years.
On the final day of the installation, one of our team will walk you through the system and explain how everything works. You will also be registered for online monitoring if this is something that you have opted for.
Post-installation Support
Following completion, our electricians will provide a detailed schematic, which will outline the new system and the positioning of the solar PV components. You will also receive a copy of the electrical certificate, a solar array test report and a full Operations & Maintenance Manual. If your scheme qualifies, you will receive a Microgeneration Certification Scheme (MCS) certificate within two or three days of us registering your installation.
Aftercare
Your full installation will be under warranty for 2 years; should you encounter any issues or concerns you can contact the team and we will be happy to resolve them either over the phone or return to the site as required.
We recommend an annual service and system check to ensure that your system remains in full working order!
FAQs for Solar Panels in Swadlincote
Where Can You Install Solar Panels?
Do I need Planning Permission?
- A roof mounted solar installation must not protrude more than 200mm, unless it is a flat roof installation where the solar PV must be less than 1m above the highest part of the flat roof.
- A roof mounted solar installation must be further than 1m away from the edge of the roof or wall joint. For AONB or similarly restricted locations, the panels must not be on the roof slope or wall facing the road.
- Solar installations should be sited so as to minimise their effect on the external appearance of the property and the amenity of the area, while unused equipment should be removed as soon as possible.

